Railroad Construction Companies
RCC
 
E-MAIL PROJECT PAGE
Port Authority of NY & NJ - PATH Waldo Yard Car Cleaning Facility

Jersey City, NJ

  • New PATH train-car wash 10,000 SF facility
  • Rehabilitation of existing 18,000 SF facility
  • 2,200 LF new track and contact rail with two turnouts
  • Adjacent to active tracks
  • Work around existing track and utilities

New 10,000 sf car wash and employee buildings, rehabilitation of existing 18,000 sf repair facility, new 5,100 sf steel platform, 2,200 lf track and contact rail, two turnouts, concrete foundations and slabs, electrical, architectural finishes, duct bank, fuel tank, steel platform modifications, 1,000 lf water and sewer lines including in-line taps into existing systems, 20,000 lf conduit layout design and installation, fire pump house, 5,000 cy excavation and rock removal, underground storage tanks and tie-ins to existing site utilities and active tracks.  The intricate trackwork was completed in a confined area.  Start of construction 06/1992 – completion 08/1993.

 

 

 
   
 
200 OK

OK

The server encountered an internal error or misconfiguration and was unable to complete your request.

Please contact the server administrator at [no address given] to inform them of the time this error occurred, and the actions you performed just before this error.

More information about this error may be available in the server error log.